NEVI FUNDING NAVIGATOR




Open:         Closed:     

ARE YOUR PROJECTS NEVI READY?

Each state has an approved plan for round 1 of National Electric Vehicle Infrastructure (NEVI) funding. Depending on your state, additional criteria beyond the NEVI minimum standards could apply. Understanding your state’s plan will be imperative to securing funding for sites and ensuring you have the appropriate equipment to meet your state’s NEVI deployment plan.

Access your state's information quickly and easily using this helpful tool.

USING THE MAP

Click on a State to see their NEVI status at a glance. Then, follow the link to the state's website for detailed information on Federal and State requirements related to NEVI funding. 


FEEV_NEVIGuide_UpdatedDownload_562x298.jpg

ARE YOUR PROJECTS NEVI-READY?

The National Electric Vehicle Infrastructure (NEVI) Funding program provides funding to aid in the deployment of electric vehicle charging infrastructure. As part of the program, $5 billion in capital will be distributed over the next five years. Download this quick guide to make sure your next EV project qualifies. 

 

DOWNLOAD THE GUIDE

5 WAYS NEXPHASE™ IS NEVI-READY

CHARGER REQUIREMENTS

EV NexPHase - Icon - Resiliency.psd

What are the requirements
for charger types?

NEVI: A minimum of four 150 kW chargers per location

NEXPHASE™: NexPhase™ contains the entire infrastructure required between the utility service and up to four 150 kW Level 3 chargers.

UPTIME ASSURANCE

EV-Uptime-Icon.psd

What are the charger
uptime requirements?

NEVI: 97%

NEXPHASE™: Unlike any switchgear of its kind, NexPhase™ features cuttingedge grid intelligence for
switchgear and EV charger remote monitoring and control. NexPhase™ allows operators to pinpoint off-line EV chargers and provides remote capabilities to bring them back online faster.

UPTIME REPORTING

EV-Reporting-Icon.psd

Are there uptime
reporting requirements?

NEVI: States may require annual, quarterly, and even real-time reporting

NEXPHASE™: NexPhase™ securely communicates with the UNITE™ web interface, providing user-friendly access to monitoring information and reporting, including: transaction analysis, energy consumption, charge duration, EV charger state, utility power monitoring, and more.

INSTALLATION REQUIREMENTS

EV NexPHase - Icon - Install.psd

Who can install EV
charger infrastructure?

NEVI: Only qualified technicians can install EV charger infrastructure

NEXPHASE™: NexPhase™ only requires the on-site connections for the incoming power and outgoing charger connections, reducing on-site installation time and costs. All internal components come pre-installed. NexPhase™ allows contractors to execute more EV charger projects with their existing workforce.

MAINTENANCE PLANNING

EV-Services-Icon.psd

What are the maintenance
planning requirements?

NEVI: A minimum five-year maintenance plan

NEXPHASE™: Early detection of EV charger deficiencies and system performance diagnostics
provided by NexPhase™ equipment operators with the tools to improve uptime, extend
equipment service life, enhance reliability, and deploy predictive EV charger system maintenance.


The information provided on this website does not, and is not intended to, constitute legal advice. Readers of this website should contact their attorney to obtain advice with respect to any particular legal matter.  All liability with respect to actions taken or not taken based on the contents of this website are hereby expressly disclaimed. 
OUR COMMITMENT

We are a leader in the manufacturing and distribution of systems to support the management and monitoring of critical assets. As an expert in both vehicle refueling and utility asset monitoring, we are committed to supporting the emerging EV charging market. Our turnkey solutions enable rapid deployment with intelligent monitoring to maximize charger operational uptime.